WageBasis

Highway construction wage rates — James*, Virginia

33 classifications published for highway construction in James*, from one general wage determination. Base rate and fringe are printed exactly as the determination publishes them; base plus fringe is the only figure calculated here.

VA20260195 — modification 2

Reproduced from General Decision VA20260195, modification 2, published 2026-08-06 by the U.S. Department of Labor. Read the same determination on SAM.gov.

VA20260195 modification 2 prints 33 classifications in its rate tables, transcribed here as published. The loaded rate is the published base rate plus the published fringe; nothing else is calculated.

Reproduced from General Decision VA20260195, modification 2, published 2026-08-06 by the U.S. Department of Labor. Read the same determination at https://sam.gov/wage-determination/VA20260195/2.

  • ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION

    Base rate
    $36.85
    Fringe
    $14.13
    Base + fringe
    $50.98

    ELEC0080-011 · Union rate · effective 2025-06-01

  • CARPENTER, INCLUDES FORM WORK

    Base rate
    $20.21
    Fringe
    $0.00
    Base + fringe
    $20.21

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • CEMENT MASON/CONCRETE FINISHER

    Base rate
    $16.03
    Fringe
    $0.00
    Base + fringe
    $16.03

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • IRONWORKER, REINFORCING

    Base rate
    $24.03
    Fringe
    $0.00
    Base + fringe
    $24.03

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • IRONWORKER, STRUCTURAL

    Base rate
    $27.38
    Fringe
    $0.00
    Base + fringe
    $27.38

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR

    Base rate
    $18.62
    Fringe
    $2.62
    Base + fringe
    $21.24

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • LABORER: COMMON OR GENERAL

    Base rate
    $14.85
    Fringe
    $0.00
    Base + fringe
    $14.85

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • LABORER: GRADE CHECKER

    Base rate
    $14.88
    Fringe
    $0.00
    Base + fringe
    $14.88

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • LABORER: PIPELAYER

    Base rate
    $17.76
    Fringe
    $0.00
    Base + fringe
    $17.76

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • LABORER: POWER TOOL OPERATOR

    Base rate
    $15.69
    Fringe
    $0.00
    Base + fringe
    $15.69

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE

    Base rate
    $20.74
    Fringe
    $0.00
    Base + fringe
    $20.74

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • OPERATOR: BOBCAT/SKID STEER/SKID LOADER

    Base rate
    $19.16
    Fringe
    $4.45
    Base + fringe
    $23.61

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • OPERATOR: BROOM/SWEEPER

    Base rate
    $17.40
    Fringe
    $2.01
    Base + fringe
    $19.41

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • OPERATOR: CRANE

    Base rate
    $24.42
    Fringe
    $4.69
    Base + fringe
    $29.11

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • OPERATOR: DRILL

    Base rate
    $24.66
    Fringe
    $0.00
    Base + fringe
    $24.66

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • OPERATOR: GRADALL

    Base rate
    $19.26
    Fringe
    $0.00
    Base + fringe
    $19.26

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • OPERATOR: GRADER/BLADE

    Base rate
    $23.21
    Fringe
    $0.00
    Base + fringe
    $23.21

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • OPERATOR: HYDROSEEDER

    Base rate
    $16.64
    Fringe
    $0.00
    Base + fringe
    $16.64

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • OPERATOR: LOADER

    Base rate
    $17.86
    Fringe
    $0.00
    Base + fringe
    $17.86

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • OPERATOR: MECHANIC

    Base rate
    $21.43
    Fringe
    $0.00
    Base + fringe
    $21.43

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • OPERATOR: MILLING MACHINE

    Base rate
    $23.12
    Fringe
    $3.60
    Base + fringe
    $26.72

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)

    Base rate
    $20.12
    Fringe
    $3.81
    Base + fringe
    $23.93

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • OPERATOR: PILEDRIVER

    Base rate
    $21.83
    Fringe
    $4.08
    Base + fringe
    $25.91

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • OPERATOR: ROLLER

    Base rate
    $21.32
    Fringe
    $0.00
    Base + fringe
    $21.32

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • OPERATOR: SCREED

    Base rate
    $22.13
    Fringe
    $4.89
    Base + fringe
    $27.02

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR

    Base rate
    $19.09
    Fringe
    $1.81
    Base + fringe
    $20.90

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • OPERATOR: BULLDOZER, INCLUDING UTILITY

    Base rate
    $19.43
    Fringe
    $0.00
    Base + fringe
    $19.43

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • TRAFFIC CONTROL: FLAGGER

    Base rate
    $12.89
    Fringe
    $0.00
    Base + fringe
    $12.89

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • TRUCK DRIVER: HEAVY 7CY & UNDER

    Base rate
    $15.53
    Fringe
    $0.00
    Base + fringe
    $15.53

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • TRUCK DRIVER: 1/SINGLE AXLE TRUCK

    Base rate
    $18.26
    Fringe
    $4.88
    Base + fringe
    $23.14

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • TRUCK DRIVER: FUEL AND LUBRICANT SERVICE

    Base rate
    $18.25
    Fringe
    $0.00
    Base + fringe
    $18.25

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • TRUCK DRIVER: HEAVY OVER 7 CY

    Base rate
    $16.98
    Fringe
    $0.00
    Base + fringe
    $16.98

    SUVA2016-080 · Survey rate · effective 2018-07-02

  • TRUCK DRIVER: MULTI AXLE

    Base rate
    $18.77
    Fringe
    $4.63
    Base + fringe
    $23.40

    SUVA2016-080 · Survey rate · effective 2018-07-02

Full determination, counties covered, and modification history for VA20260195

A classification that is not printed on the determination is not priced by it. The published route for adding one is a conformance request to the contracting officer, not an estimate.

Price the classifications you are bidding

Pick the determination, tick the classifications you carry, enter your hours, and get a dated basis document: the determination number, the modification number, the publication date, the counties covered, the premium-pay footnotes attached to each classification you priced, and the extended cost at your hours.

This page covers federal Davis-Bacon general wage determinations only. State prevailing-wage programmes and Service Contract Act determinations are published separately and are not included here.

The Department of Labor republishes determinations under new modification numbers. This page shows the modification named above; check the source before relying on these rates in a bid.

Which determination, construction type, and classification apply to a particular contract depends on facts specific to that contract. This page states what the published determination says; confirm applicability with your contracting officer.