VA20260195 — Virginia Highway
Modification 2, published 2026-08-06, covering 13 counties with 33 classifications published.
Reproduced from General Decision VA20260195, modification 2, published 2026-08-06 by the U.S. Department of Labor. Read the same determination on SAM.gov.
VA20260195 modification 2 prints 33 classifications in its rate tables, transcribed here as published. The loaded rate is the published base rate plus the published fringe; nothing else is calculated.
Reproduced from General Decision VA20260195, modification 2, published 2026-08-06 by the U.S. Department of Labor. Read the same determination at https://sam.gov/wage-determination/VA20260195/2.
Counties covered
Gloucester, Mathews, Suffolk*, Virginia Beach*, Williamsburg*, York, Newport News*, James*, Portsmouth*, Poquoson*, Norfolk*, Chesapeake*, Hampton*
Construction types
Modification history
- Modification 0published 2026-01-02
- Modification 1published 2026-05-18
- Modification 2published 2026-08-06shown on this page
This is the history the determination itself prints. What a later modification changed, if anything, is a comparison between two published revisions — not something this page asserts.
33 classifications
ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION
- Base rate
- $36.85
- Fringe
- $14.13
- Base + fringe
- $50.98
ELEC0080-011 · Union rate · effective 2025-06-01
CARPENTER, INCLUDES FORM WORK
- Base rate
- $20.21
- Fringe
- $0.00
- Base + fringe
- $20.21
SUVA2016-080 · Survey rate · effective 2018-07-02
CEMENT MASON/CONCRETE FINISHER
- Base rate
- $16.03
- Fringe
- $0.00
- Base + fringe
- $16.03
SUVA2016-080 · Survey rate · effective 2018-07-02
IRONWORKER, REINFORCING
- Base rate
- $24.03
- Fringe
- $0.00
- Base + fringe
- $24.03
SUVA2016-080 · Survey rate · effective 2018-07-02
IRONWORKER, STRUCTURAL
- Base rate
- $27.38
- Fringe
- $0.00
- Base + fringe
- $27.38
SUVA2016-080 · Survey rate · effective 2018-07-02
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR
- Base rate
- $18.62
- Fringe
- $2.62
- Base + fringe
- $21.24
SUVA2016-080 · Survey rate · effective 2018-07-02
LABORER: COMMON OR GENERAL
- Base rate
- $14.85
- Fringe
- $0.00
- Base + fringe
- $14.85
SUVA2016-080 · Survey rate · effective 2018-07-02
LABORER: GRADE CHECKER
- Base rate
- $14.88
- Fringe
- $0.00
- Base + fringe
- $14.88
SUVA2016-080 · Survey rate · effective 2018-07-02
LABORER: PIPELAYER
- Base rate
- $17.76
- Fringe
- $0.00
- Base + fringe
- $17.76
SUVA2016-080 · Survey rate · effective 2018-07-02
LABORER: POWER TOOL OPERATOR
- Base rate
- $15.69
- Fringe
- $0.00
- Base + fringe
- $15.69
SUVA2016-080 · Survey rate · effective 2018-07-02
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE
- Base rate
- $20.74
- Fringe
- $0.00
- Base + fringe
- $20.74
SUVA2016-080 · Survey rate · effective 2018-07-02
OPERATOR: BOBCAT/SKID STEER/SKID LOADER
- Base rate
- $19.16
- Fringe
- $4.45
- Base + fringe
- $23.61
SUVA2016-080 · Survey rate · effective 2018-07-02
OPERATOR: BROOM/SWEEPER
- Base rate
- $17.40
- Fringe
- $2.01
- Base + fringe
- $19.41
SUVA2016-080 · Survey rate · effective 2018-07-02
OPERATOR: CRANE
- Base rate
- $24.42
- Fringe
- $4.69
- Base + fringe
- $29.11
SUVA2016-080 · Survey rate · effective 2018-07-02
OPERATOR: DRILL
- Base rate
- $24.66
- Fringe
- $0.00
- Base + fringe
- $24.66
SUVA2016-080 · Survey rate · effective 2018-07-02
OPERATOR: GRADALL
- Base rate
- $19.26
- Fringe
- $0.00
- Base + fringe
- $19.26
SUVA2016-080 · Survey rate · effective 2018-07-02
OPERATOR: GRADER/BLADE
- Base rate
- $23.21
- Fringe
- $0.00
- Base + fringe
- $23.21
SUVA2016-080 · Survey rate · effective 2018-07-02
OPERATOR: HYDROSEEDER
- Base rate
- $16.64
- Fringe
- $0.00
- Base + fringe
- $16.64
SUVA2016-080 · Survey rate · effective 2018-07-02
OPERATOR: LOADER
- Base rate
- $17.86
- Fringe
- $0.00
- Base + fringe
- $17.86
SUVA2016-080 · Survey rate · effective 2018-07-02
OPERATOR: MECHANIC
- Base rate
- $21.43
- Fringe
- $0.00
- Base + fringe
- $21.43
SUVA2016-080 · Survey rate · effective 2018-07-02
OPERATOR: MILLING MACHINE
- Base rate
- $23.12
- Fringe
- $3.60
- Base + fringe
- $26.72
SUVA2016-080 · Survey rate · effective 2018-07-02
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)
- Base rate
- $20.12
- Fringe
- $3.81
- Base + fringe
- $23.93
SUVA2016-080 · Survey rate · effective 2018-07-02
OPERATOR: PILEDRIVER
- Base rate
- $21.83
- Fringe
- $4.08
- Base + fringe
- $25.91
SUVA2016-080 · Survey rate · effective 2018-07-02
OPERATOR: ROLLER
- Base rate
- $21.32
- Fringe
- $0.00
- Base + fringe
- $21.32
SUVA2016-080 · Survey rate · effective 2018-07-02
OPERATOR: SCREED
- Base rate
- $22.13
- Fringe
- $4.89
- Base + fringe
- $27.02
SUVA2016-080 · Survey rate · effective 2018-07-02
OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR
- Base rate
- $19.09
- Fringe
- $1.81
- Base + fringe
- $20.90
SUVA2016-080 · Survey rate · effective 2018-07-02
OPERATOR: BULLDOZER, INCLUDING UTILITY
- Base rate
- $19.43
- Fringe
- $0.00
- Base + fringe
- $19.43
SUVA2016-080 · Survey rate · effective 2018-07-02
TRAFFIC CONTROL: FLAGGER
- Base rate
- $12.89
- Fringe
- $0.00
- Base + fringe
- $12.89
SUVA2016-080 · Survey rate · effective 2018-07-02
TRUCK DRIVER: HEAVY 7CY & UNDER
- Base rate
- $15.53
- Fringe
- $0.00
- Base + fringe
- $15.53
SUVA2016-080 · Survey rate · effective 2018-07-02
TRUCK DRIVER: 1/SINGLE AXLE TRUCK
- Base rate
- $18.26
- Fringe
- $4.88
- Base + fringe
- $23.14
SUVA2016-080 · Survey rate · effective 2018-07-02
TRUCK DRIVER: FUEL AND LUBRICANT SERVICE
- Base rate
- $18.25
- Fringe
- $0.00
- Base + fringe
- $18.25
SUVA2016-080 · Survey rate · effective 2018-07-02
TRUCK DRIVER: HEAVY OVER 7 CY
- Base rate
- $16.98
- Fringe
- $0.00
- Base + fringe
- $16.98
SUVA2016-080 · Survey rate · effective 2018-07-02
TRUCK DRIVER: MULTI AXLE
- Base rate
- $18.77
- Fringe
- $4.63
- Base + fringe
- $23.40
SUVA2016-080 · Survey rate · effective 2018-07-02
A classification that is not printed on the determination is not priced by it. The published route for adding one is a conformance request to the contracting officer, not an estimate.
Price the classifications you are bidding
Pick the determination, tick the classifications you carry, enter your hours, and get a dated basis document: the determination number, the modification number, the publication date, the counties covered, the premium-pay footnotes attached to each classification you priced, and the extended cost at your hours.
This page covers federal Davis-Bacon general wage determinations only. State prevailing-wage programmes and Service Contract Act determinations are published separately and are not included here.
The Department of Labor republishes determinations under new modification numbers. This page shows the modification named above; check the source before relying on these rates in a bid.
Which determination, construction type, and classification apply to a particular contract depends on facts specific to that contract. This page states what the published determination says; confirm applicability with your contracting officer.