WageBasis

AL20260078 — Alabama Building

Modification 1, published 2026-05-18, covering 8 counties with 13 classifications published.

Reproduced from General Decision AL20260078, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination on SAM.gov.

AL20260078 modification 1 prints 13 classifications in its rate tables, transcribed here as published. The loaded rate is the published base rate plus the published fringe; nothing else is calculated.

Reproduced from General Decision AL20260078, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination at https://sam.gov/wage-determination/AL20260078/1.

Counties covered

Barbour, Bullock, Butler, Coffee, Covington, Crenshaw, Macon, Pike

Construction types

Modification history

  • Modification 0published 2026-01-02
  • Modification 1published 2026-05-18shown on this page

This is the history the determination itself prints. What a later modification changed, if anything, is a comparison between two published revisions — not something this page asserts.

13 classifications

  • BOILERMAKER

    Base rate
    $34.21
    Fringe
    $23.92
    Base + fringe
    $58.13

    BOIL0108-001 · Union rate · effective 2025-01-01

  • ELECTRICIAN

    Base rate
    $32.15
    Fringe
    $17.43
    Base + fringe
    $49.58

    ELEC0443-005 · Union rate · effective 2025-09-01

  • POWER EQUIPMENT OPERATOR: FORKLIFT

    Base rate
    $29.90
    Fringe
    $14.55
    Base + fringe
    $44.45

    ENGI0653-014 · Union rate · effective 2023-10-01

  • POWER EQUIPMENT OPERATOR: BULLDOZER

    Base rate
    $29.90
    Fringe
    $14.55
    Base + fringe
    $44.45

    ENGI0653-014 · Union rate · effective 2023-10-01

  • PLUMBER

    Base rate
    $35.20
    Fringe
    $13.51
    Base + fringe
    $48.71

    PLUM0119-001 · Union rate · effective 2025-07-23

  • TRUCK DRIVER: DUMP TRUCK

    Base rate
    $14.05
    Fringe
    $0.00
    Base + fringe
    $14.05

    SUAL2015-006 · Survey rate · effective 2017-08-02

  • SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)

    Base rate
    $20.00
    Fringe
    $10.94
    Base + fringe
    $30.94

    SUAL2015-006 · Survey rate · effective 2017-08-02

  • PAINTER (BRUSH AND ROLLER)

    Base rate
    $15.83
    Fringe
    $0.00
    Base + fringe
    $15.83

    SUAL2015-006 · Survey rate · effective 2017-08-02

  • OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE

    Base rate
    $20.48
    Fringe
    $11.78
    Base + fringe
    $32.26

    SUAL2015-006 · Survey rate · effective 2017-08-02

  • LABORER: COMMON OR GENERAL

    Base rate
    $11.41
    Fringe
    $0.00
    Base + fringe
    $11.41

    SUAL2015-006 · Survey rate · effective 2017-08-02

  • CEMENT MASON/CONCRETE FINISHER

    Base rate
    $16.50
    Fringe
    $1.12
    Base + fringe
    $17.62

    SUAL2015-006 · Survey rate · effective 2017-08-02

  • CARPENTER

    Base rate
    $14.01
    Fringe
    $0.00
    Base + fringe
    $14.01

    SUAL2015-006 · Survey rate · effective 2017-08-02

  • BRICKLAYER

    Base rate
    $20.00
    Fringe
    $0.00
    Base + fringe
    $20.00

    SUAL2015-006 · Survey rate · effective 2017-08-02

A classification that is not printed on the determination is not priced by it. The published route for adding one is a conformance request to the contracting officer, not an estimate.

Price the classifications you are bidding

Pick the determination, tick the classifications you carry, enter your hours, and get a dated basis document: the determination number, the modification number, the publication date, the counties covered, the premium-pay footnotes attached to each classification you priced, and the extended cost at your hours.

This page covers federal Davis-Bacon general wage determinations only. State prevailing-wage programmes and Service Contract Act determinations are published separately and are not included here.

The Department of Labor republishes determinations under new modification numbers. This page shows the modification named above; check the source before relying on these rates in a bid.

Which determination, construction type, and classification apply to a particular contract depends on facts specific to that contract. This page states what the published determination says; confirm applicability with your contracting officer.