Heavy construction wage rates — Randall, Texas
34 classifications published for heavy construction in Randall, from one general wage determination. Base rate and fringe are printed exactly as the determination publishes them; base plus fringe is the only figure calculated here.
TX20260002 — modification 1
Reproduced from General Decision TX20260002, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination on SAM.gov.
TX20260002 modification 1 prints 34 classifications in its rate tables, transcribed here as published. The loaded rate is the published base rate plus the published fringe; nothing else is calculated.
Reproduced from General Decision TX20260002, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination at https://sam.gov/wage-determination/TX20260002/1.
TRUCK DRIVER (TANDEM AXLE TRACTOR WITH SEMI)
- Base rate
- $12.49
- Fringe
- $0.00
- Base + fringe
- $12.49
SUTX2011-002 · Survey rate · effective 2011-08-02
TRUCK DRIVER (SINGLE OR TANDEM AXLE DUMP)
- Base rate
- $11.33
- Fringe
- $0.00
- Base + fringe
- $11.33
SUTX2011-002 · Survey rate · effective 2011-08-02
TRUCK DRIVER (SINGLE AXLE)
- Base rate
- $12.74
- Fringe
- $0.00
- Base + fringe
- $12.74
SUTX2011-002 · Survey rate · effective 2011-08-02
TRUCK DRIVER (LOWBOY-FLOAT)
- Base rate
- $14.46
- Fringe
- $0.00
- Base + fringe
- $14.46
SUTX2011-002 · Survey rate · effective 2011-08-02
STEEL WORKER (REINFORCING)
- Base rate
- $13.50
- Fringe
- $0.00
- Base + fringe
- $13.50
SUTX2011-002 · Survey rate · effective 2011-08-02
SERVICER
- Base rate
- $13.98
- Fringe
- $0.00
- Base + fringe
- $13.98
SUTX2011-002 · Survey rate · effective 2011-08-02
POWER EQUIPMENT OPERATOR: SCRAPER
- Base rate
- $10.61
- Fringe
- $0.00
- Base + fringe
- $10.61
SUTX2011-002 · Survey rate · effective 2011-08-02
POWER EQUIPMENT OPERATOR: MECHANIC
- Base rate
- $20.14
- Fringe
- $0.00
- Base + fringe
- $20.14
SUTX2011-002 · Survey rate · effective 2011-08-02
POWER EQUIPMENT OPERATOR: (SPREADER BOX)
- Base rate
- $12.60
- Fringe
- $0.00
- Base + fringe
- $12.60
SUTX2011-002 · Survey rate · effective 2011-08-02
POWER EQUIPMENT OPERATOR: (ROLLER, OTHER)
- Base rate
- $10.36
- Fringe
- $0.00
- Base + fringe
- $10.36
SUTX2011-002 · Survey rate · effective 2011-08-02
POWER EQUIPMENT OPERATOR: (ROLLER, ASPHALT)
- Base rate
- $10.95
- Fringe
- $0.00
- Base + fringe
- $10.95
SUTX2011-002 · Survey rate · effective 2011-08-02
POWER EQUIPMENT OPERATOR: (RECLAIMER/PULVERIZER)
- Base rate
- $12.85
- Fringe
- $0.00
- Base + fringe
- $12.85
SUTX2011-002 · Survey rate · effective 2011-08-02
POWER EQUIPMENT OPERATOR: (PAVEMENT MARKING MACHINE)
- Base rate
- $16.42
- Fringe
- $0.00
- Base + fringe
- $16.42
SUTX2011-002 · Survey rate · effective 2011-08-02
POWER EQUIPMENT OPERATOR: (MOTOR GRADER, FINE)
- Base rate
- $17.49
- Fringe
- $0.00
- Base + fringe
- $17.49
SUTX2011-002 · Survey rate · effective 2011-08-02
POWER EQUIPMENT OPERATOR: (MOTOR GRADER, ROUGH)
- Base rate
- $16.15
- Fringe
- $0.00
- Base + fringe
- $16.15
SUTX2011-002 · Survey rate · effective 2011-08-02
POWER EQUIPMENT OPERATOR: (MILLING MACHINE)
- Base rate
- $15.54
- Fringe
- $0.00
- Base + fringe
- $15.54
SUTX2011-002 · Survey rate · effective 2011-08-02
POWER EQUIPMENT OPERATOR: (LOADER/BACKHOE)
- Base rate
- $14.18
- Fringe
- $0.00
- Base + fringe
- $14.18
SUTX2011-002 · Survey rate · effective 2011-08-02
POWER EQUIPMENT OPERATOR: (FRONT END LOADER, 3CY OR LESS)
- Base rate
- $12.28
- Fringe
- $0.00
- Base + fringe
- $12.28
SUTX2011-002 · Survey rate · effective 2011-08-02
POWER EQUIPMENT OPERATOR: (FRONT END LOADER OPERATOR, OVER 3 CY)
- Base rate
- $12.77
- Fringe
- $0.00
- Base + fringe
- $12.77
SUTX2011-002 · Survey rate · effective 2011-08-02
POWER EQUIPMENT OPERATOR: (EXCAVATOR, 50,000 LBS OR LESS)
- Base rate
- $13.46
- Fringe
- $0.00
- Base + fringe
- $13.46
SUTX2011-002 · Survey rate · effective 2011-08-02
POWER EQUIPMENT OPERATOR: (CRAWLER TRACTOR OPERATOR)
- Base rate
- $13.96
- Fringe
- $0.00
- Base + fringe
- $13.96
SUTX2011-002 · Survey rate · effective 2011-08-02
POWER EQUIPMENT OPERATOR: (CRANE, LATTICE BOOM 80 TONS OR LESS)
- Base rate
- $16.82
- Fringe
- $0.00
- Base + fringe
- $16.82
SUTX2011-002 · Survey rate · effective 2011-08-02
POWER EQUIPMENT OPERATOR: (BROOM AND SWEEPER)
- Base rate
- $11.21
- Fringe
- $0.00
- Base + fringe
- $11.21
SUTX2011-002 · Survey rate · effective 2011-08-02
POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE)
- Base rate
- $13.40
- Fringe
- $0.00
- Base + fringe
- $13.40
SUTX2011-002 · Survey rate · effective 2011-08-02
POWER EQUIPMENT OPERATOR: (ASPHALT DISTRIBUTER)
- Base rate
- $14.87
- Fringe
- $0.00
- Base + fringe
- $14.87
SUTX2011-002 · Survey rate · effective 2011-08-02
LABORER: ASPHALT RAKER
- Base rate
- $12.28
- Fringe
- $0.00
- Base + fringe
- $12.28
SUTX2011-002 · Survey rate · effective 2011-08-02
LABORER (WORK ZONE BARRICADE SERVICER)
- Base rate
- $10.30
- Fringe
- $0.00
- Base + fringe
- $10.30
SUTX2011-002 · Survey rate · effective 2011-08-02
LABORER (LABORER, UTILITY)
- Base rate
- $11.80
- Fringe
- $0.00
- Base + fringe
- $11.80
SUTX2011-002 · Survey rate · effective 2011-08-02
LABORER (LABORER, COMMON)
- Base rate
- $10.30
- Fringe
- $0.00
- Base + fringe
- $10.30
SUTX2011-002 · Survey rate · effective 2011-08-02
LABORER (FLAGGER)
- Base rate
- $9.30
- Fringe
- $0.00
- Base + fringe
- $9.30
SUTX2011-002 · Survey rate · effective 2011-08-02
FORM BUILDER/FORM SETTER (STRUCTURES)
- Base rate
- $13.52
- Fringe
- $0.00
- Base + fringe
- $13.52
SUTX2011-002 · Survey rate · effective 2011-08-02
FORM BUILDER/FORM SETTER (PAVING & CURB)
- Base rate
- $12.36
- Fringe
- $0.00
- Base + fringe
- $12.36
SUTX2011-002 · Survey rate · effective 2011-08-02
ELECTRICIAN
- Base rate
- $20.96
- Fringe
- $0.00
- Base + fringe
- $20.96
SUTX2011-002 · Survey rate · effective 2011-08-02
CEMENT MASON/CONCRETE FINISHER (PAVING & STRUCTURES)
- Base rate
- $13.55
- Fringe
- $0.00
- Base + fringe
- $13.55
SUTX2011-002 · Survey rate · effective 2011-08-02
Full determination, counties covered, and modification history for TX20260002
A classification that is not printed on the determination is not priced by it. The published route for adding one is a conformance request to the contracting officer, not an estimate.
Price the classifications you are bidding
Pick the determination, tick the classifications you carry, enter your hours, and get a dated basis document: the determination number, the modification number, the publication date, the counties covered, the premium-pay footnotes attached to each classification you priced, and the extended cost at your hours.
This page covers federal Davis-Bacon general wage determinations only. State prevailing-wage programmes and Service Contract Act determinations are published separately and are not included here.
The Department of Labor republishes determinations under new modification numbers. This page shows the modification named above; check the source before relying on these rates in a bid.
Which determination, construction type, and classification apply to a particular contract depends on facts specific to that contract. This page states what the published determination says; confirm applicability with your contracting officer.