WageBasis

Residential construction wage rates — Montgomery, Arkansas

15 classifications published for residential construction in Montgomery, from one general wage determination. Base rate and fringe are printed exactly as the determination publishes them; base plus fringe is the only figure calculated here.

AR20260106 — modification 1

Reproduced from General Decision AR20260106, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination on SAM.gov.

AR20260106 modification 1 prints 15 classifications in its rate tables, transcribed here as published. The loaded rate is the published base rate plus the published fringe; nothing else is calculated.

Reproduced from General Decision AR20260106, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination at https://sam.gov/wage-determination/AR20260106/1.

  • TRUCK DRIVER: DUMP TRUCK

    Base rate
    $8.95
    Fringe
    $0.00
    Base + fringe
    $8.95

    SUAR2008-217 · Survey rate · effective 2008-11-28

  • SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION

    Base rate
    $10.21
    Fringe
    $0.00
    Base + fringe
    $10.21

    SUAR2008-217 · Survey rate · effective 2008-11-28

  • ROOFER

    Base rate
    $10.40
    Fringe
    $0.00
    Base + fringe
    $10.40

    SUAR2008-217 · Survey rate · effective 2008-11-28

  • PLUMBER

    Base rate
    $13.98
    Fringe
    $0.00
    Base + fringe
    $13.98

    SUAR2008-217 · Survey rate · effective 2008-11-28

  • PAINTER: BRUSH AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING

    Base rate
    $12.44
    Fringe
    $0.00
    Base + fringe
    $12.44

    SUAR2008-217 · Survey rate · effective 2008-11-28

  • OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE

    Base rate
    $10.88
    Fringe
    $0.00
    Base + fringe
    $10.88

    SUAR2008-217 · Survey rate · effective 2008-11-28

  • LABORER: MASON TENDER - CEMENT/CONCRETE

    Base rate
    $8.06
    Fringe
    $0.00
    Base + fringe
    $8.06

    SUAR2008-217 · Survey rate · effective 2008-11-28

  • LABORER: MASON TENDER - BRICK

    Base rate
    $8.98
    Fringe
    $0.00
    Base + fringe
    $8.98

    SUAR2008-217 · Survey rate · effective 2008-11-28

  • LABORER: COMMON OR GENERAL

    Base rate
    $8.35
    Fringe
    $0.00
    Base + fringe
    $8.35

    SUAR2008-217 · Survey rate · effective 2008-11-28

  • INSTALLER-SIDING (VINYL ONLY)

    Base rate
    $10.00
    Fringe
    $0.00
    Base + fringe
    $10.00

    SUAR2008-217 · Survey rate · effective 2008-11-28

  • HVAC MECHANIC (INSTALLATION OF HVAC DUCT AND UNIT)

    Base rate
    $10.73
    Fringe
    $0.00
    Base + fringe
    $10.73

    SUAR2008-217 · Survey rate · effective 2008-11-28

  • ELECTRICIAN

    Base rate
    $16.50
    Fringe
    $0.00
    Base + fringe
    $16.50

    SUAR2008-217 · Survey rate · effective 2008-11-28

  • CEMENT MASON/CONCRETE FINISHER

    Base rate
    $12.20
    Fringe
    $0.00
    Base + fringe
    $12.20

    SUAR2008-217 · Survey rate · effective 2008-11-28

  • CARPENTER, INCLUDES CABINET INSTALLATION, AND DRYWALL FINISHING/TAPING AND HANGING

    Base rate
    $14.89
    Fringe
    $0.00
    Base + fringe
    $14.89

    SUAR2008-217 · Survey rate · effective 2008-11-28

  • BRICKLAYER

    Base rate
    $17.60
    Fringe
    $0.00
    Base + fringe
    $17.60

    SUAR2008-217 · Survey rate · effective 2008-11-28

Full determination, counties covered, and modification history for AR20260106

A classification that is not printed on the determination is not priced by it. The published route for adding one is a conformance request to the contracting officer, not an estimate.

Price the classifications you are bidding

Pick the determination, tick the classifications you carry, enter your hours, and get a dated basis document: the determination number, the modification number, the publication date, the counties covered, the premium-pay footnotes attached to each classification you priced, and the extended cost at your hours.

This page covers federal Davis-Bacon general wage determinations only. State prevailing-wage programmes and Service Contract Act determinations are published separately and are not included here.

The Department of Labor republishes determinations under new modification numbers. This page shows the modification named above; check the source before relying on these rates in a bid.

Which determination, construction type, and classification apply to a particular contract depends on facts specific to that contract. This page states what the published determination says; confirm applicability with your contracting officer.