Residential construction wage rates — Columbia, Arkansas
15 classifications published for residential construction in Columbia, from one general wage determination. Base rate and fringe are printed exactly as the determination publishes them; base plus fringe is the only figure calculated here.
AR20260074 — modification 1
Reproduced from General Decision AR20260074, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination on SAM.gov.
AR20260074 modification 1 prints 15 classifications in its rate tables, transcribed here as published. The loaded rate is the published base rate plus the published fringe; nothing else is calculated.
Reproduced from General Decision AR20260074, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination at https://sam.gov/wage-determination/AR20260074/1.
TRUCK DRIVER, INCLUDES DUMP TRUCK
- Base rate
- $8.95
- Fringe
- $0.00
- Base + fringe
- $8.95
SUAR2008-185 · Survey rate · effective 2008-11-28
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION
- Base rate
- $9.99
- Fringe
- $0.00
- Base + fringe
- $9.99
SUAR2008-185 · Survey rate · effective 2008-11-28
ROOFER
- Base rate
- $10.40
- Fringe
- $0.00
- Base + fringe
- $10.40
SUAR2008-185 · Survey rate · effective 2008-11-28
PLUMBER
- Base rate
- $13.98
- Fringe
- $0.00
- Base + fringe
- $13.98
SUAR2008-185 · Survey rate · effective 2008-11-28
PAINTER: BRUSH AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING
- Base rate
- $12.44
- Fringe
- $0.00
- Base + fringe
- $12.44
SUAR2008-185 · Survey rate · effective 2008-11-28
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE
- Base rate
- $10.88
- Fringe
- $0.00
- Base + fringe
- $10.88
SUAR2008-185 · Survey rate · effective 2008-11-28
LABORER: MASON TENDER - CEMENT/CONCRETE
- Base rate
- $8.06
- Fringe
- $0.00
- Base + fringe
- $8.06
SUAR2008-185 · Survey rate · effective 2008-11-28
LABORER: MASON TENDER - BRICK
- Base rate
- $8.98
- Fringe
- $0.00
- Base + fringe
- $8.98
SUAR2008-185 · Survey rate · effective 2008-11-28
LABORER: COMMON OR GENERAL
- Base rate
- $8.35
- Fringe
- $0.00
- Base + fringe
- $8.35
SUAR2008-185 · Survey rate · effective 2008-11-28
INSTALLER-SIDING (VINYL ONLY)
- Base rate
- $10.00
- Fringe
- $0.00
- Base + fringe
- $10.00
SUAR2008-185 · Survey rate · effective 2008-11-28
HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT)
- Base rate
- $10.56
- Fringe
- $0.00
- Base + fringe
- $10.56
SUAR2008-185 · Survey rate · effective 2008-11-28
ELECTRICIAN
- Base rate
- $16.50
- Fringe
- $0.00
- Base + fringe
- $16.50
SUAR2008-185 · Survey rate · effective 2008-11-28
CEMENT MASON/CONCRETE FINISHER
- Base rate
- $12.20
- Fringe
- $0.00
- Base + fringe
- $12.20
SUAR2008-185 · Survey rate · effective 2008-11-28
CARPENTER, INCLUDES CABINET INSTALLATION, AND DRYWALL FINISHING/TAPING AND HANGING
- Base rate
- $14.89
- Fringe
- $0.00
- Base + fringe
- $14.89
SUAR2008-185 · Survey rate · effective 2008-11-28
BRICKLAYER
- Base rate
- $17.60
- Fringe
- $0.00
- Base + fringe
- $17.60
SUAR2008-185 · Survey rate · effective 2008-11-28
Full determination, counties covered, and modification history for AR20260074
A classification that is not printed on the determination is not priced by it. The published route for adding one is a conformance request to the contracting officer, not an estimate.
Price the classifications you are bidding
Pick the determination, tick the classifications you carry, enter your hours, and get a dated basis document: the determination number, the modification number, the publication date, the counties covered, the premium-pay footnotes attached to each classification you priced, and the extended cost at your hours.
This page covers federal Davis-Bacon general wage determinations only. State prevailing-wage programmes and Service Contract Act determinations are published separately and are not included here.
The Department of Labor republishes determinations under new modification numbers. This page shows the modification named above; check the source before relying on these rates in a bid.
Which determination, construction type, and classification apply to a particular contract depends on facts specific to that contract. This page states what the published determination says; confirm applicability with your contracting officer.