WageBasis

Highway construction wage rates — Mohave, Arizona

46 classifications published for highway construction in Mohave, from one general wage determination. Base rate and fringe are printed exactly as the determination publishes them; base plus fringe is the only figure calculated here.

AZ20260046 — modification 1

Reproduced from General Decision AZ20260046, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination on SAM.gov.

AZ20260046 modification 1 prints 46 classifications in its rate tables, transcribed here as published. The loaded rate is the published base rate plus the published fringe; nothing else is calculated.

Reproduced from General Decision AZ20260046, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination at https://sam.gov/wage-determination/AZ20260046/1.

  • CARPENTER, EXCLUDES FORMWORK CONCRETE

    Base rate
    $35.89
    Fringe
    $14.98
    Base + fringe
    $50.87

    CARP1912-003 · Union rate · effective 2024-07-01

  • POWER EQUIPMENT OPERATOR: BULLDOZER

    Base rate
    $35.56
    Fringe
    $18.12
    Base + fringe
    $53.68

    ENGI0012-046 · Union rate · effective 2024-12-01

  • POWER EQUIPMENT OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT (ASPHALT, AGGREGATE, & CONCRETE)

    Base rate
    $35.56
    Fringe
    $18.12
    Base + fringe
    $53.68

    ENGI0012-051 · Union rate · effective 2024-12-01

  • POWER EQUIPMENT OPERATOR: SCRAPER

    Base rate
    $35.56
    Fringe
    $18.12
    Base + fringe
    $53.68

    ENGI0012-052 · Union rate · effective 2024-12-01

  • POWER EQUIPMENT OPERATOR: TRACTOR

    Base rate
    $35.56
    Fringe
    $18.12
    Base + fringe
    $53.68

    ENGI0012-053 · Union rate · effective 2024-12-01

  • POWER EQUIPMENT OPERATOR: (DRILL RIG/AUGER)

    Base rate
    $36.64
    Fringe
    $18.12
    Base + fringe
    $54.76

    ENGI0012-057 · Union rate · effective 2024-12-01

  • POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER

    Base rate
    $32.29
    Fringe
    $18.12
    Base + fringe
    $50.41

    ENGI0012-064 · Union rate · effective 2024-12-01

  • POWER EQUIPMENT OPERATOR: BACKHOE/BACKHOE & LOADER COMBO/TRACK BACKHOE

    Base rate
    $35.56
    Fringe
    $18.12
    Base + fringe
    $53.68

    ENGI0012-066 · Union rate · effective 2024-12-01

  • TRUCK DRIVER: OFF ROAD TRUCK

    Base rate
    $35.56
    Fringe
    $18.12
    Base + fringe
    $53.68

    ENGI0012-070 · Union rate · effective 2024-12-01

  • POWER EQUIPMENT OPERATOR: CRANE/DERRICK

    Base rate
    $36.64
    Fringe
    $18.12
    Base + fringe
    $54.76

    ENGI0012-071 · Union rate · effective 2024-12-01

  • POWER EQUIPMENT OPERATOR: MOTOR GRADER/BLADE

    Base rate
    $36.64
    Fringe
    $18.12
    Base + fringe
    $54.76

    ENGI0012-074 · Union rate · effective 2024-12-01

  • POWER EQUIPMENT OPERATOR: MECHANIC

    Base rate
    $37.67
    Fringe
    $18.12
    Base + fringe
    $55.79

    ENGI0012-075 · Union rate · effective 2024-12-01

  • POWER EQUIPMENT OPERATOR: HORIZONTAL DIRECTIONAL DRILL

    Base rate
    $31.98
    Fringe
    $9.26
    Base + fringe
    $41.24

    LABO1184-016 · Union rate · effective 2025-06-01

  • LABORER: FENCE ERECTOR

    Base rate
    $27.41
    Fringe
    $9.26
    Base + fringe
    $36.67

    LABO1184-017 · Union rate · effective 2025-06-01

  • LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR

    Base rate
    $29.91
    Fringe
    $9.26
    Base + fringe
    $39.17

    LABO1184-025 · Union rate · effective 2025-06-01

  • LABORER: GRADE SETTER

    Base rate
    $29.91
    Fringe
    $9.26
    Base + fringe
    $39.17

    LABO1184-027 · Union rate · effective 2025-06-01

  • LABORER: MASON TENDER

    Base rate
    $29.91
    Fringe
    $9.26
    Base + fringe
    $39.17

    LABO1184-030 · Union rate · effective 2025-06-01

  • LABORER: PIPELAYER

    Base rate
    $30.88
    Fringe
    $9.26
    Base + fringe
    $40.14

    LABO1184-032 · Union rate · effective 2025-06-01

  • POWER EQUIPMENT OPERATOR: TRENCHER

    Base rate
    $30.88
    Fringe
    $9.26
    Base + fringe
    $40.14

    LABO1184-033 · Union rate · effective 2025-06-01

  • CARPENTER: FORMWORK CONCRETE

    Base rate
    $31.98
    Fringe
    $9.26
    Base + fringe
    $41.24

    LABO1184-037 · Union rate · effective 2024-06-01

  • POWER EQUIPMENT OPERATOR: FORKLIFT

    Base rate
    $30.88
    Fringe
    $9.26
    Base + fringe
    $40.14

    LABO1184-044 · Union rate · effective 2025-06-01

  • TRUCK DRIVER: CONCRETE

    Base rate
    $30.88
    Fringe
    $9.26
    Base + fringe
    $40.14

    LABO1184-047 · Union rate · effective 2025-06-01

  • TRUCK DRIVER: WATER

    Base rate
    $30.88
    Fringe
    $9.26
    Base + fringe
    $40.14

    LABO1184-049 · Union rate · effective 2025-06-01

  • TRUCK DRIVER: SWEEPER

    Base rate
    $20.24
    Fringe
    $5.48
    Base + fringe
    $25.72

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • TRUCK DRIVER: OIL DISTRIBUTOR

    Base rate
    $29.75
    Fringe
    $8.04
    Base + fringe
    $37.79

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • TRUCK DRIVER: DUMP

    Base rate
    $25.78
    Fringe
    $0.69
    Base + fringe
    $26.47

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • TRAFFIC CONTROL

    Base rate
    $23.50
    Fringe
    $3.02
    Base + fringe
    $26.52

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • POWER EQUIPMENT OPERATOR: OILER

    Base rate
    $31.56
    Fringe
    $10.69
    Base + fringe
    $42.25

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • POWER EQUIPMENT OPERATOR: MILLING MACHINE

    Base rate
    $30.09
    Fringe
    $6.45
    Base + fringe
    $36.54

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER

    Base rate
    $30.15
    Fringe
    $0.81
    Base + fringe
    $30.96

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • POWER EQUIPMENT OPERATOR: GRADE CHECKER

    Base rate
    $29.74
    Fringe
    $13.07
    Base + fringe
    $42.81

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • POWER EQUIPMENT OPERATOR: FIELD EQUIPMENT SERVICEPERSON

    Base rate
    $35.39
    Fringe
    $11.50
    Base + fringe
    $46.89

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE

    Base rate
    $31.27
    Fringe
    $6.90
    Base + fringe
    $38.17

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • POWER EQUIPMENT OPERATOR: CONCRETE SCREED

    Base rate
    $25.70
    Fringe
    $7.15
    Base + fringe
    $32.85

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • POWER EQUIPMENT OPERATOR: CONCRETE PUMP TRUCK

    Base rate
    $43.11
    Fringe
    $10.87
    Base + fringe
    $53.98

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • POWER EQUIPMENT OPERATOR: COMPACTOR/ROLLER

    Base rate
    $28.29
    Fringe
    $6.46
    Base + fringe
    $34.75

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • POWER EQUIPMENT OPERATOR: BROOM/SWEEPER

    Base rate
    $26.47
    Fringe
    $7.26
    Base + fringe
    $33.73

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • POWER EQUIPMENT OPERATOR: BOOM/CRANE TRUCK

    Base rate
    $43.11
    Fringe
    $10.87
    Base + fringe
    $53.98

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • PAINTER: SIGN AND DISPLAY ERECTOR

    Base rate
    $18.03
    Fringe
    $0.00
    Base + fringe
    $18.03

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • PAINTER: PAVEMENT MARKING

    Base rate
    $24.60
    Fringe
    $6.34
    Base + fringe
    $30.94

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • LABORER: LANDSCAPE LABORER

    Base rate
    $18.03
    Fringe
    $0.00
    Base + fringe
    $18.03

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • LABORER: GENERAL

    Base rate
    $22.35
    Fringe
    $0.60
    Base + fringe
    $22.95

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND)

    Base rate
    $25.22
    Fringe
    $5.08
    Base + fringe
    $30.30

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • IRONWORKER

    Base rate
    $33.15
    Fringe
    $18.57
    Base + fringe
    $51.72

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • ELECTRICIAN

    Base rate
    $29.00
    Fringe
    $7.58
    Base + fringe
    $36.58

    SUAZ2023-023 · Survey rate · effective 2024-11-19

  • CEMENT MASON/CONCRETE FINISHER

    Base rate
    $30.09
    Fringe
    $0.00
    Base + fringe
    $30.09

    SUAZ2023-023 · Survey rate · effective 2024-11-19

Full determination, counties covered, and modification history for AZ20260046

A classification that is not printed on the determination is not priced by it. The published route for adding one is a conformance request to the contracting officer, not an estimate.

Price the classifications you are bidding

Pick the determination, tick the classifications you carry, enter your hours, and get a dated basis document: the determination number, the modification number, the publication date, the counties covered, the premium-pay footnotes attached to each classification you priced, and the extended cost at your hours.

This page covers federal Davis-Bacon general wage determinations only. State prevailing-wage programmes and Service Contract Act determinations are published separately and are not included here.

The Department of Labor republishes determinations under new modification numbers. This page shows the modification named above; check the source before relying on these rates in a bid.

Which determination, construction type, and classification apply to a particular contract depends on facts specific to that contract. This page states what the published determination says; confirm applicability with your contracting officer.