Highway construction wage rates — Gila, Arizona
21 classifications published for highway construction in Gila, from one general wage determination. Base rate and fringe are printed exactly as the determination publishes them; base plus fringe is the only figure calculated here.
AZ20260026 — modification 1
Reproduced from General Decision AZ20260026, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination on SAM.gov.
AZ20260026 modification 1 prints 21 classifications in its rate tables, transcribed here as published. The loaded rate is the published base rate plus the published fringe; nothing else is calculated.
Reproduced from General Decision AZ20260026, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination at https://sam.gov/wage-determination/AZ20260026/1.
POWER EQUIPMENT OPERATOR: (DRILL RIG/AUGER)
- Base rate
- $35.56
- Fringe
- $18.12
- Base + fringe
- $53.68
ENGI0012-068 · Union rate · effective 2024-12-01
IRONWORKER
- Base rate
- $39.50
- Fringe
- $19.91
- Base + fringe
- $59.41
IRON0075-013 · Union rate · effective 2025-08-01
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR
- Base rate
- $29.91
- Fringe
- $9.26
- Base + fringe
- $39.17
LABO1184-025 · Union rate · effective 2025-06-01
LABORER: MASON TENDER
- Base rate
- $29.91
- Fringe
- $9.26
- Base + fringe
- $39.17
LABO1184-030 · Union rate · effective 2025-06-01
LABORER: PIPELAYER
- Base rate
- $31.98
- Fringe
- $9.26
- Base + fringe
- $41.24
LABO1184-038 · Union rate · effective 2025-06-01
TRUCK DRIVER: WATER
- Base rate
- $31.53
- Fringe
- $3.36
- Base + fringe
- $34.89
SUAZ2023-014 · Survey rate · effective 2024-11-19
TRUCK DRIVER: DUMP
- Base rate
- $24.50
- Fringe
- $2.75
- Base + fringe
- $27.25
SUAZ2023-014 · Survey rate · effective 2024-11-19
TRAFFIC CONTROL
- Base rate
- $20.00
- Fringe
- $0.00
- Base + fringe
- $20.00
SUAZ2023-014 · Survey rate · effective 2024-11-19
POWER EQUIPMENT OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT (ASPHALT, AGGREGATE, & CONCRETE)
- Base rate
- $30.40
- Fringe
- $0.06
- Base + fringe
- $30.46
SUAZ2023-014 · Survey rate · effective 2024-11-19
POWER EQUIPMENT OPERATOR: OILER
- Base rate
- $31.86
- Fringe
- $10.01
- Base + fringe
- $41.87
SUAZ2023-014 · Survey rate · effective 2024-11-19
POWER EQUIPMENT OPERATOR: MOTOR GRADER/BLADE
- Base rate
- $36.90
- Fringe
- $3.81
- Base + fringe
- $40.71
SUAZ2023-014 · Survey rate · effective 2024-11-19
POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER
- Base rate
- $38.84
- Fringe
- $0.00
- Base + fringe
- $38.84
SUAZ2023-014 · Survey rate · effective 2024-11-19
POWER EQUIPMENT OPERATOR: FORKLIFT
- Base rate
- $38.76
- Fringe
- $9.20
- Base + fringe
- $47.96
SUAZ2023-014 · Survey rate · effective 2024-11-19
POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE
- Base rate
- $39.48
- Fringe
- $0.00
- Base + fringe
- $39.48
SUAZ2023-014 · Survey rate · effective 2024-11-19
POWER EQUIPMENT OPERATOR: CRANE / DERRICKS
- Base rate
- $45.76
- Fringe
- $13.82
- Base + fringe
- $59.58
SUAZ2023-014 · Survey rate · effective 2024-11-19
POWER EQUIPMENT OPERATOR: CONCRETE SCREED
- Base rate
- $33.90
- Fringe
- $0.00
- Base + fringe
- $33.90
SUAZ2023-014 · Survey rate · effective 2024-11-19
POWER EQUIPMENT OPERATOR: COMPACTOR/ROLLER
- Base rate
- $34.26
- Fringe
- $0.00
- Base + fringe
- $34.26
SUAZ2023-014 · Survey rate · effective 2024-11-19
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER
- Base rate
- $32.53
- Fringe
- $0.00
- Base + fringe
- $32.53
SUAZ2023-014 · Survey rate · effective 2024-11-19
PAINTER: SIGN AND DISPLAY ERECTOR
- Base rate
- $19.06
- Fringe
- $2.99
- Base + fringe
- $22.05
SUAZ2023-014 · Survey rate · effective 2024-11-19
LABORER: GENERAL
- Base rate
- $28.65
- Fringe
- $5.25
- Base + fringe
- $33.90
SUAZ2023-014 · Survey rate · effective 2024-11-19
CARPENTER: FORMWORK CONCRETE
- Base rate
- $33.16
- Fringe
- $10.71
- Base + fringe
- $43.87
SUAZ2023-014 · Survey rate · effective 2024-11-19
Full determination, counties covered, and modification history for AZ20260026
A classification that is not printed on the determination is not priced by it. The published route for adding one is a conformance request to the contracting officer, not an estimate.
Price the classifications you are bidding
Pick the determination, tick the classifications you carry, enter your hours, and get a dated basis document: the determination number, the modification number, the publication date, the counties covered, the premium-pay footnotes attached to each classification you priced, and the extended cost at your hours.
This page covers federal Davis-Bacon general wage determinations only. State prevailing-wage programmes and Service Contract Act determinations are published separately and are not included here.
The Department of Labor republishes determinations under new modification numbers. This page shows the modification named above; check the source before relying on these rates in a bid.
Which determination, construction type, and classification apply to a particular contract depends on facts specific to that contract. This page states what the published determination says; confirm applicability with your contracting officer.