14 classifications published for building construction in Marion, from one general wage determination. Base rate and fringe are printed exactly as the determination publishes them; base plus fringe is the only figure calculated here.

AL20260081 — modification 1

Reproduced from General Decision AL20260081, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination on SAM.gov.

AL20260081 modification 1 prints 14 classifications in its rate tables, transcribed here as published. The loaded rate is the published base rate plus the published fringe; nothing else is calculated.

Reproduced from General Decision AL20260081, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination at https://sam.gov/wage-determination/AL20260081/1.

  • BOILERMAKER

    Base rate
    $34.21
    Fringe
    $23.92
    Base + fringe
    $58.13

    BOIL0108-001 · Union rate · effective 2025-01-01

  • CARPENTER

    Base rate
    $30.26
    Fringe
    $14.78
    Base + fringe
    $45.04

    CARP1209-002 · Union rate · effective 2025-01-01

  • POWER EQUIPMENT OPERATOR: FORKLIFT

    Base rate
    $29.90
    Fringe
    $14.55
    Base + fringe
    $44.45

    ENGI0653-015 · Union rate · effective 2023-10-01

  • PLUMBER

    Base rate
    $35.20
    Fringe
    $13.51
    Base + fringe
    $48.71

    PLUM0119-001 · Union rate · effective 2025-07-23

  • SPRINKLER FITTER (FIRE SPRINKLERS)

    Base rate
    $33.78
    Fringe
    $22.03
    Base + fringe
    $55.81

    SFAL0669-002 · Union rate · effective 2025-04-01

  • TRUCK DRIVER: DUMP TRUCK

    Base rate
    $14.05
    Fringe
    $0.00
    Base + fringe
    $14.05

    SUAL2015-009 · Survey rate · effective 2017-08-02

  • PAINTER (BRUSH AND ROLLER)

    Base rate
    $15.10
    Fringe
    $0.00
    Base + fringe
    $15.10

    SUAL2015-009 · Survey rate · effective 2017-08-02

  • OPERATOR: BULLDOZER

    Base rate
    $15.72
    Fringe
    $2.64
    Base + fringe
    $18.36

    SUAL2015-009 · Survey rate · effective 2017-08-02

  • OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE

    Base rate
    $20.48
    Fringe
    $11.78
    Base + fringe
    $32.26

    SUAL2015-009 · Survey rate · effective 2017-08-02

  • LABORER: COMMON OR GENERAL

    Base rate
    $13.75
    Fringe
    $0.00
    Base + fringe
    $13.75

    SUAL2015-009 · Survey rate · effective 2017-08-02

  • HVAC MECHANIC (HVAC DUCT INSTALLATION ONLY)

    Base rate
    $20.50
    Fringe
    $2.12
    Base + fringe
    $22.62

    SUAL2015-009 · Survey rate · effective 2017-08-02

  • ELECTRICIAN

    Base rate
    $21.59
    Fringe
    $6.39
    Base + fringe
    $27.98

    SUAL2015-009 · Survey rate · effective 2017-08-02

  • CEMENT MASON/CONCRETE FINISHER

    Base rate
    $16.50
    Fringe
    $1.12
    Base + fringe
    $17.62

    SUAL2015-009 · Survey rate · effective 2017-08-02

  • BRICKLAYER

    Base rate
    $20.00
    Fringe
    $0.00
    Base + fringe
    $20.00

    SUAL2015-009 · Survey rate · effective 2017-08-02

Full determination, counties covered, and modification history for AL20260081

A classification that is not printed on the determination is not priced by it. The published route for adding one is a conformance request to the contracting officer, not an estimate.

Price the classifications you are bidding

Pick the determination, tick the classifications you carry, enter your hours, and get a dated basis document: the determination number, the modification number, the publication date, the counties covered, the premium-pay footnotes attached to each classification you priced, and the extended cost at your hours.

This page covers federal Davis-Bacon general wage determinations only. State prevailing-wage programmes and Service Contract Act determinations are published separately and are not included here.

The Department of Labor republishes determinations under new modification numbers. This page shows the modification named above; check the source before relying on these rates in a bid.

Which determination, construction type, and classification apply to a particular contract depends on facts specific to that contract. This page states what the published determination says; confirm applicability with your contracting officer.