Heavy construction wage rates — Clay, Alabama
37 classifications published for heavy construction in Clay, from 3 general wage determinations. Base rate and fringe are printed exactly as the determination publishes them; base plus fringe is the only figure calculated here.
AL20260001 — modification 1
Reproduced from General Decision AL20260001, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination on SAM.gov.
AL20260001 modification 1 prints 1 classification in its rate tables, transcribed here as published. The loaded rate is the published base rate plus the published fringe; nothing else is calculated.
Reproduced from General Decision AL20260001, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination at https://sam.gov/wage-determination/AL20260001/1.
SELF-PROPELLED HOPPER DREDGE DRAG TENDERS THE FOLLOWING RATES WERE REVISED PURSUANT TO 29 CFR 1.6(C)(1) ON 02/07/2025
- Base rate
- $20.36
- Fringe
- $7.24
- Base + fringe
- $27.60
SUAL1998-001 · Survey rate · effective 1998-03-26
Full determination, counties covered, and modification history for AL20260001
AL20260002 — modification 1
Reproduced from General Decision AL20260002, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination on SAM.gov.
AL20260002 modification 1 prints 22 classifications in its rate tables, transcribed here as published. The loaded rate is the published base rate plus the published fringe; nothing else is calculated.
Reproduced from General Decision AL20260002, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination at https://sam.gov/wage-determination/AL20260002/1.
THIRD ASSISTANT ENGINEER DREDGE (16' AND OVER)
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
SECOND COOK (HYDRAULIC DREDGING)
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
SECOND ASSISTANT ENGINEER DREDGE (16' AND OVER)
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
OPERATOR (MARSH BUGGY DRAGLINE)
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
OILER (MARSH BUGGY DRAGLINE)
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
JANITOR - CABIN PERSON (HYDRAULIC DREDGING)
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
HANDYMAN (HYDRAULIC DREDGING)
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
FIRST COOK (HYDRAULIC DREDGING)
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
FIRST ASSISTANT ENGINEER DREDGE (16' AND OVER)
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
DREDGE (UNDER 16'), TENDER OPERATOR
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
DREDGE (UNDER 16'), OILER
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
DREDGE (UNDER 16'), LEVERMAN
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
DREDGE (UNDER 16'), DECKHAND
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
DREDGE (16' AND OVER), TRUCK DRIVER
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
DREDGE (16' AND OVER), TENDER OPERATOR
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
DREDGE (16' AND OVER), SHOREMAN
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
DREDGE (16' AND OVER), OILER
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
DREDGE (16' AND OVER), LEVERMAN
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
DREDGE (16' AND OVER), FIREMAN
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
DREDGE (16' AND OVER), DECKHAND
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
DOZER OPERATOR
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
DERRICK OPERATOR
- Base rate
- $19.67
- Fringe
- $0.00
- Base + fringe
- $19.67
SUAL1990-006 · Survey rate · effective 1990-02-15
Full determination, counties covered, and modification history for AL20260002
AL20260069 — modification 1
Reproduced from General Decision AL20260069, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination on SAM.gov.
AL20260069 modification 1 prints 14 classifications in its rate tables, transcribed here as published. The loaded rate is the published base rate plus the published fringe; nothing else is calculated.
Reproduced from General Decision AL20260069, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination at https://sam.gov/wage-determination/AL20260069/1.
OPERATING ENGINEERS: OILER
- Base rate
- $28.45
- Fringe
- $13.98
- Base + fringe
- $42.43
ENGI0312-009 · Union rate · effective 2023-09-01
OPERATING ENGINEERS: CRANE AND CHERRY PICKER CRANES WITH 100 FT. OR MORE BOOM RECEIVE $0.25 EXTRA PER HOUR, CRANES WITH 200 FT. OR MORE BOOM RECEIVE $0.50 EXTRA PER HOUR, CRANES WITH 350 FT. OR MORE BOOM RECIEVE $1.10 EXTRA PER HOUR, CRANES WITH 500 FT. OR MORE BOOM RECEIVE $1.45 EXTRA PER HOUR, TOWER CRANES, DERRICKS, CLIMBING CRANES, RINGER CRANES SHALL RECEIVE $0.35 IN ADDITION TO A-RATE AND BOOM PAY PER HOUR
- Base rate
- $31.52
- Fringe
- $13.98
- Base + fringe
- $45.50
ENGI0312-009 · Union rate · effective 2023-09-01
TRUCK DRIVER
- Base rate
- $15.70
- Fringe
- $5.86
- Base + fringe
- $21.56
SUAL2007-154 · Survey rate · effective 2007-11-28
OPERATOR: TRACKHOE
- Base rate
- $12.00
- Fringe
- $0.00
- Base + fringe
- $12.00
SUAL2007-154 · Survey rate · effective 2007-11-28
OPERATOR: SCRAPER
- Base rate
- $9.78
- Fringe
- $0.18
- Base + fringe
- $9.96
SUAL2007-154 · Survey rate · effective 2007-11-28
OPERATOR: ROLLER
- Base rate
- $9.45
- Fringe
- $0.00
- Base + fringe
- $9.45
SUAL2007-154 · Survey rate · effective 2007-11-28
OPERATOR: LOADER (FRONT END)
- Base rate
- $11.67
- Fringe
- $0.00
- Base + fringe
- $11.67
SUAL2007-154 · Survey rate · effective 2007-11-28
OPERATOR: GRADER/BLADE
- Base rate
- $12.59
- Fringe
- $1.33
- Base + fringe
- $13.92
SUAL2007-154 · Survey rate · effective 2007-11-28
OPERATOR: DRILL
- Base rate
- $9.50
- Fringe
- $2.36
- Base + fringe
- $11.86
SUAL2007-154 · Survey rate · effective 2007-11-28
OPERATOR: BULLDOZER
- Base rate
- $16.60
- Fringe
- $2.64
- Base + fringe
- $19.24
SUAL2007-154 · Survey rate · effective 2007-11-28
OPERATOR: BACKHOE
- Base rate
- $13.46
- Fringe
- $0.00
- Base + fringe
- $13.46
SUAL2007-154 · Survey rate · effective 2007-11-28
LABORER: PIPELAYER
- Base rate
- $10.13
- Fringe
- $0.00
- Base + fringe
- $10.13
SUAL2007-154 · Survey rate · effective 2007-11-28
LABORER: COMMON OR GENERAL
- Base rate
- $8.54
- Fringe
- $0.00
- Base + fringe
- $8.54
SUAL2007-154 · Survey rate · effective 2007-11-28
ELECTRICIAN
- Base rate
- $15.96
- Fringe
- $3.57
- Base + fringe
- $19.53
SUAL2007-154 · Survey rate · effective 2007-11-28
Full determination, counties covered, and modification history for AL20260069
A classification that is not printed on the determination is not priced by it. The published route for adding one is a conformance request to the contracting officer, not an estimate.
Price the classifications you are bidding
Pick the determination, tick the classifications you carry, enter your hours, and get a dated basis document: the determination number, the modification number, the publication date, the counties covered, the premium-pay footnotes attached to each classification you priced, and the extended cost at your hours.
This page covers federal Davis-Bacon general wage determinations only. State prevailing-wage programmes and Service Contract Act determinations are published separately and are not included here.
The Department of Labor republishes determinations under new modification numbers. This page shows the modification named above; check the source before relying on these rates in a bid.
Which determination, construction type, and classification apply to a particular contract depends on facts specific to that contract. This page states what the published determination says; confirm applicability with your contracting officer.