Residential construction wage rates — Barbour, Alabama
17 classifications published for residential construction in Barbour, from one general wage determination. Base rate and fringe are printed exactly as the determination publishes them; base plus fringe is the only figure calculated here.
AL20260010 — modification 1
Reproduced from General Decision AL20260010, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination on SAM.gov.
AL20260010 modification 1 prints 17 classifications in its rate tables, transcribed here as published. The loaded rate is the published base rate plus the published fringe; nothing else is calculated.
Reproduced from General Decision AL20260010, modification 1, published 2026-05-18 by the U.S. Department of Labor. Read the same determination at https://sam.gov/wage-determination/AL20260010/1.
TRUCK DRIVER
- Base rate
- $10.02
- Fringe
- $0.00
- Base + fringe
- $10.02
SUAL2007-093 · Survey rate · effective 2007-10-23
TILE SETTER
- Base rate
- $16.00
- Fringe
- $0.00
- Base + fringe
- $16.00
SUAL2007-093 · Survey rate · effective 2007-10-23
SHEET METAL WORKER
- Base rate
- $10.47
- Fringe
- $0.00
- Base + fringe
- $10.47
SUAL2007-093 · Survey rate · effective 2007-10-23
ROOFER, INCLUDES SHAKE & SHINGLE, AND SINGLE PLY ROOFS
- Base rate
- $8.00
- Fringe
- $0.00
- Base + fringe
- $8.00
SUAL2007-093 · Survey rate · effective 2007-10-23
PLUMBER
- Base rate
- $10.25
- Fringe
- $0.00
- Base + fringe
- $10.25
SUAL2007-093 · Survey rate · effective 2007-10-23
PAINTER: BRUSH AND ROLLER, EXCLUDES DRYWALL FINISHING/TAPING
- Base rate
- $10.21
- Fringe
- $0.00
- Base + fringe
- $10.21
SUAL2007-093 · Survey rate · effective 2007-10-23
OPERATOR: BULLDOZER
- Base rate
- $11.71
- Fringe
- $0.00
- Base + fringe
- $11.71
SUAL2007-093 · Survey rate · effective 2007-10-23
OPERATOR: BACKHOE
- Base rate
- $9.80
- Fringe
- $0.00
- Base + fringe
- $9.80
SUAL2007-093 · Survey rate · effective 2007-10-23
LABORER: MASON TENDER - CEMENT/CONCRETE
- Base rate
- $8.00
- Fringe
- $0.00
- Base + fringe
- $8.00
SUAL2007-093 · Survey rate · effective 2007-10-23
LABORER: LANDSCAPE
- Base rate
- $7.25
- Fringe
- $0.00
- Base + fringe
- $7.25
SUAL2007-093 · Survey rate · effective 2007-10-23
LABORER: COMMON OR GENERAL
- Base rate
- $7.42
- Fringe
- $0.00
- Base + fringe
- $7.42
SUAL2007-093 · Survey rate · effective 2007-10-23
ELECTRICIAN, INCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS
- Base rate
- $10.54
- Fringe
- $0.00
- Base + fringe
- $10.54
SUAL2007-093 · Survey rate · effective 2007-10-23
DRYWALL HANGER
- Base rate
- $11.18
- Fringe
- $0.00
- Base + fringe
- $11.18
SUAL2007-093 · Survey rate · effective 2007-10-23
DRYWALL FINISHER/TAPER
- Base rate
- $10.00
- Fringe
- $0.00
- Base + fringe
- $10.00
SUAL2007-093 · Survey rate · effective 2007-10-23
CEMENT MASON/CONCRETE FINISHER
- Base rate
- $9.00
- Fringe
- $0.00
- Base + fringe
- $9.00
SUAL2007-093 · Survey rate · effective 2007-10-23
CARPENTER
- Base rate
- $10.17
- Fringe
- $0.00
- Base + fringe
- $10.17
SUAL2007-093 · Survey rate · effective 2007-10-23
BRICKLAYER
- Base rate
- $12.94
- Fringe
- $0.00
- Base + fringe
- $12.94
SUAL2007-093 · Survey rate · effective 2007-10-23
Full determination, counties covered, and modification history for AL20260010
A classification that is not printed on the determination is not priced by it. The published route for adding one is a conformance request to the contracting officer, not an estimate.
Price the classifications you are bidding
Pick the determination, tick the classifications you carry, enter your hours, and get a dated basis document: the determination number, the modification number, the publication date, the counties covered, the premium-pay footnotes attached to each classification you priced, and the extended cost at your hours.
This page covers federal Davis-Bacon general wage determinations only. State prevailing-wage programmes and Service Contract Act determinations are published separately and are not included here.
The Department of Labor republishes determinations under new modification numbers. This page shows the modification named above; check the source before relying on these rates in a bid.
Which determination, construction type, and classification apply to a particular contract depends on facts specific to that contract. This page states what the published determination says; confirm applicability with your contracting officer.